[Cialug] Mailling List Admin
James Shoemaker
james at dhlake.com
Thu Apr 22 09:35:16 CDT 2010
L. V. Lammert wrote:
> At 08:20 AM 4/22/2010, you wrote:
>> Whoa guys.
>>
>> We're getting a little heated and getting a lot off topic.
>>
>> Let's remember that we're all friends and that few of us are
>> electrical engineers, OK?
>
> NP, .. just trying to provide a reality check for folks in similar
> situations. We have had a lot of problems trying to figure out how to
> get things done with our generator system, and sometimes it seems
> like the local municipalities are just trying to CY[T]A at YOUR expense.
>
> We used to have a split-bus panel, and for 15 years I physically
> pulled the meter every time the generator was required. Only last
> year did we get a transfer switch installed, .. at a cost of almost
> ***$4K***. (*Plus* the generator.)
>
> Reality & practicality, while maintaining a sane level of safety,
> trumps ivory tower regulations every time.
A manual transfer switch is no where near $4K.
James
More information about the Cialug
mailing list